The project begins with a full tear-off: every existing shingle, underlayment layer, and piece of flashing is removed down to the roof deck. Haven’s crew inspects the exposed decking for water damage, rot, or structural deterioration and replaces any compromised sections. A self-adhering peel-and-stick underlayment is applied across the entire deck, followed by drip edge along the eaves and rakes, metal flashing at every valley and wall junction, and starter strips along the eaves before the shingle courses begin.

The shingles are installed from the eave to the ridge in overlapping courses, with each course offset to prevent water from following a seam. Ridge caps are installed at the peak, and pipe boots, vent flashings, and any penetration details are sealed and integrated into the shingle field. Haven schedules the Broward County inspection as part of the project timeline.